Gujarat has 8,63,729 rooftop solar systems installed under PM Surya Ghar: Muft Bijli Yojana, from 13,14,519 applications, as recorded on the Government of India national portal. That is No. 1 of India's 36 states and UTs.
Key figures
PM Surya Ghar in Gujarat, cumulative, as recorded on the national portal. The bar is Gujarat's share of India's total.
- Applications
- 13,14,51915% of India
- Installations
- 8,63,72917% of India
- Households covered
- 12,15,95621% of India
- Installed capacity
- 3.24 GW19% of India
- Subsidy released
- ₹6,266 Cr19% of India
Gujarat against India
How Gujarat compares with India
GujaratIndiaRank position
"Applications built" is installations as a share of applications, cumulative. Installations count systems; households count homes covered, and the two differ.
Only what is true for Gujarat
What stands out
- Gujarat added the 3rd most installations of any state or UT in September so far.
Running total, one reading a morning
Installations, day by day
Gujarat recorded 11,092 new installations in the 7 days to 28 Sep, and 38,532 in September so far.
Running totalDaily changeLast 7 days
Every reading since 29 Aug
| Date | Applications | Installations | Change |
|---|---|---|---|
| 28 Sep | 13,14,519 | 8,63,729 | +321 |
| 27 Sep | 13,12,862 | 8,63,408 | +1,698 |
| 26 Sep | 13,05,377 | 8,61,710 | +1,455 |
| 25 Sep | 12,90,853 | 8,60,255 | +1,984 |
| 24 Sep | 12,74,463 | 8,58,271 | +1,766 |
| 23 Sep | 12,57,704 | 8,56,505 | +1,985 |
| 22 Sep | 12,43,764 | 8,54,520 | +1,883 |
| 21 Sep | 12,35,754 | 8,52,637 | +183 |
| 20 Sep | 12,35,347 | 8,52,454 | +1,628 |
| 19 Sep | 12,33,692 | 8,50,826 | +1,697 |
| 18 Sep | 12,31,810 | 8,49,129 | +1,597 |
| 17 Sep | 12,29,822 | 8,47,532 | +1,647 |
| 16 Sep | 12,28,108 | 8,45,885 | +1,560 |
| 15 Sep | 12,26,380 | 8,44,325 | +1,427 |
| 14 Sep | 12,24,862 | 8,42,898 | +215 |
| 13 Sep | 12,24,608 | 8,42,683 | +1,575 |
| 12 Sep | 12,22,870 | 8,41,108 | +1,756 |
| 11 Sep | 12,20,890 | 8,39,352 | +1,938 |
| 10 Sep | 12,18,680 | 8,37,414 | +2,142 |
| 9 Sep | 12,16,418 | 8,35,272 | +2,022 |
| 8 Sep | 12,14,149 | 8,33,250 | +1,857 |
| 7 Sep | 12,11,848 | 8,31,393 | +190 |
| 6 Sep | 12,11,518 | 8,31,203 | +795 |
| 5 Sep | 12,10,555 | 8,30,408 | +504 |
| 4 Sep | 12,09,935 | 8,29,904 | +1,288 |
| 3 Sep | 12,08,702 | 8,28,616 | +1,836 |
| 2 Sep | 12,07,227 | 8,26,780 | +4,608 |
| 31 Aug | 12,03,321 | 8,22,172 | +240 |
| 30 Aug | 12,02,900 | 8,21,932 | +1,898 |
One reading a morning. No reading was taken on 1 Sep; the change recorded after a gap covers the whole gap.
All 36 states and UTs, by installations
Where Gujarat ranks
Bar heights use a log scale, so the smallest states and UTs stay visible. Each step up the scale is ten times more installations.
| # | State / UT | Installations | Built |
|---|---|---|---|
| 1 | Gujarat | 8,63,729 | 66% |
| 2 | Uttar Pradesh | 8,58,106 | 66% |
| 3 | Maharashtra | 8,19,543 | 53% |
No. 1 of 36
Gujarat by installations recorded, among India's 36 states and UTs. By applications it is No. 2.
33 of 33 districts with applications
District-wise PM Surya Ghar progress in Gujarat
Surat has the most installations, with 1,04,055.
InstallationsAdded in the last 7 days
| District | Installations | Applications | Built | Capacity | Avg system | Subsidy | 7 days |
|---|---|---|---|---|---|---|---|
| 1Surat | 1,04,055 | 1,46,205 | 71% | 396.2 MW | 3.81 kW | ₹768 Cr | +1,170 |
| 2Ahmedabad | 98,253 | 1,35,380 | 73% | 413.5 MW | 4.21 kW | ₹724 Cr | +1,370 |
| 3Rajkot | 93,830 | 1,17,410 | 80% | 340.8 MW | 3.63 kW | ₹701 Cr | +1,109 |
| 4Vadodara | 71,048 | 98,807 | 72% | 280.9 MW | 3.95 kW | ₹513 Cr | +833 |
| 5Junagadh | 45,422 | 60,555 | 75% | 156.4 MW | 3.44 kW | ₹327 Cr | +675 |
| 6Mahesana | 42,674 | 65,639 | 65% | 142.7 MW | 3.34 kW | ₹297 Cr | +471 |
| 7Bhavnagar | 40,633 | 59,029 | 69% | 142.7 MW | 3.51 kW | ₹289 Cr | +565 |
| 8Banas Kantha | 33,985 | 66,919 | 51% | 116.3 MW | 3.42 kW | ₹239 Cr | +441 |
| 9Anand | 29,443 | 44,882 | 66% | 116.5 MW | 3.96 kW | ₹208 Cr | +365 |
| 10Jamnagar | 27,869 | 37,136 | 75% | 100.7 MW | 3.61 kW | ₹203 Cr | +351 |
| 11Sabar Kantha | 27,044 | 47,587 | 57% | 94.9 MW | 3.51 kW | ₹198 Cr | +280 |
| 12Amreli | 24,673 | 33,986 | 73% | 83.6 MW | 3.39 kW | ₹178 Cr | +317 |
| 13Bharuch | 24,604 | 38,126 | 65% | 98.7 MW | 4.01 kW | ₹178 Cr | +334 |
| 14Kachchh | 24,099 | 33,823 | 71% | 93.6 MW | 3.89 kW | ₹174 Cr | +287 |
| 15Surendranagar | 19,912 | 26,177 | 76% | 71.3 MW | 3.58 kW | ₹147 Cr | +201 |
| 16Gandhinagar | 18,796 | 35,503 | 53% | 74.1 MW | 3.94 kW | ₹136 Cr | +237 |
| 17Kheda | 18,791 | 32,803 | 57% | 72.6 MW | 3.86 kW | ₹133 Cr | +266 |
| 18Patan | 17,851 | 33,345 | 54% | 62.9 MW | 3.52 kW | ₹126 Cr | +288 |
| 19Morbi | 15,976 | 20,512 | 78% | 57.4 MW | 3.59 kW | ₹117 Cr | +244 |
| 20Navsari | 13,404 | 28,286 | 47% | 54.8 MW | 4.09 kW | ₹98.7 Cr | +153 |
| 21Valsad | 12,487 | 33,316 | 37% | 51.9 MW | 4.16 kW | ₹91.0 Cr | +182 |
| 22Gir Somnath | 10,273 | 14,408 | 71% | 36.2 MW | 3.52 kW | ₹72.8 Cr | +222 |
| 23Porbandar | 9,985 | 13,999 | 71% | 35.5 MW | 3.55 kW | ₹71.8 Cr | +121 |
| 24Panch Mahals | 8,152 | 15,858 | 51% | 31.9 MW | 3.91 kW | ₹58.6 Cr | +117 |
| 25Botad | 7,759 | 10,388 | 75% | 27.2 MW | 3.50 kW | ₹56.6 Cr | +147 |
| 26Arvalli | 6,427 | 16,511 | 39% | 23.3 MW | 3.62 kW | ₹46.2 Cr | +70 |
| 27Mahisagar | 4,156 | 8,221 | 51% | 14.9 MW | 3.60 kW | ₹28.7 Cr | +81 |
| 28Dahod | 3,363 | 10,283 | 33% | 13.6 MW | 4.04 kW | ₹23.7 Cr | +47 |
| 29Tapi | 3,246 | 9,498 | 34% | 13.1 MW | 4.04 kW | ₹23.5 Cr | +43 |
| 30Devbhoomi Dwarka | 2,437 | 4,772 | 51% | 9.0 MW | 3.71 kW | ₹17.5 Cr | +39 |
| 31Narmada | 1,694 | 6,069 | 28% | 6.5 MW | 3.84 kW | ₹11.2 Cr | +38 |
| 32Chhotaudepur | 1,217 | 5,388 | 23% | 4.9 MW | 4.04 kW | ₹8.43 Cr | +23 |
| 33Dangs | 171 | 3,698 | 5% | 699 kW | 4.09 kW | ₹1.18 Cr | +5 |
All 33 districts are in the table: scroll inside it to see them.
6 DISCOMs handle net metering
By electricity distribution company
| DISCOM | Installations | Applications | Capacity |
|---|---|---|---|
| Paschim Gujarat Vij Co. Limited | 3,22,752 | 4,31,947 | 1.15 GW |
| Uttar Gujarat Vij Company Limited | 1,77,371 | 3,18,456 | 637.8 MW |
| Dakshin Gujarat Vij Co.Ltd (DGVCL) | 1,47,445 | 2,51,025 | 574.1 MW |
| Madhya Gujarat VIJ Company Ltd. | 1,35,465 | 2,13,988 | 532.6 MW |
| Torrent Power Limited - Ahmedabad | 68,367 | 84,814 | 292.4 MW |
| Torrent Power Limited - Surat | 12,329 | 14,289 | 48.3 MW |
-
Rajasthan
3,32,644
installations · No. 6
- Built
- 67%
- Avg system
- 3.90 kW
-
Madhya Pradesh
1,84,661
installations · No. 9
- Built
- 75%
- Avg system
- 3.75 kW
-
Maharashtra
8,19,543
installations · No. 3
- Built
- 53%
- Avg system
- 3.66 kW
-
Dadra and Nagar Haveli and Daman and Diu
1,856
installations · No. 28
- Built
- 44%
- Avg system
- 2.08 kW
Central subsidy
PM Surya Ghar subsidy in Gujarat
Gujarat receives the standard central subsidy: ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, up to ₹78,000 for a system of 3 kW or more, paid into the household's bank account. How the subsidy and application work.
About these figures
Read automatically every morning from the PM Surya Ghar: Muft Bijli Yojana national portal (pmsuryaghar.gov.in, Ministry of New and Renewable Energy), with a daily record kept since 29 Aug 2026. Compiled by Solentra Energies, Mohali. Solentra is not affiliated with MNRE. See every state, district and DISCOM on the India rooftop solar tracker.