Read 28 Sep 2026 from the national portalLast updated:
PM Surya Ghar in Odisha: rooftop solar progress
Odisha has 2,25,820 rooftop solar systems installed under PM Surya Ghar: Muft Bijli Yojana, from 3,66,427 applications, as recorded on the Government of India national portal. That is No. 7 of India's 36 states and UTs.
Key figures
PM Surya Ghar in Odisha, cumulative, as recorded on the national portal. The bar is Odisha's share of India's total.
- Applications
- 3,66,4274.3% of India
- Installations
- 2,25,8204.5% of India
- Households covered
- 2,27,1093.8% of India
- Installed capacity
- 513.1 MW2.9% of India
- Subsidy released
- ₹983 Cr3.0% of India
Odisha against India
How Odisha compares with India
OdishaIndiaRank position
"Applications built" is installations as a share of applications, cumulative. Installations count systems; households count homes covered, and the two differ.
Only what is true for Odisha
What stands out
- The average system is 2.27 kW, smaller than the national 3.51 kW.
Running total, one reading a morning
Installations, day by day
Odisha recorded 9,808 new installations in the 7 days to 28 Sep, and 13,878 in September so far.
Running totalDaily changeLast 7 days
Every reading since 29 Aug
| Date | Applications | Installations | Change |
|---|---|---|---|
| 28 Sep | 3,66,427 | 2,25,820 | +399 |
| 27 Sep | 3,65,675 | 2,25,421 | +1,301 |
| 26 Sep | 3,63,203 | 2,24,120 | +1,552 |
| 25 Sep | 3,61,643 | 2,22,568 | +2,108 |
| 24 Sep | 3,59,835 | 2,20,460 | +767 |
| 23 Sep | 3,57,499 | 2,19,693 | +2,064 |
| 22 Sep | 3,55,259 | 2,17,629 | +1,617 |
| 21 Sep | 3,52,891 | 2,16,012 | +553 |
| 20 Sep | 3,52,128 | 2,15,459 | +1,136 |
| 19 Sep | 3,49,720 | 2,14,323 | +1,681 |
| 18 Sep | 3,48,176 | 2,12,642 | +636 |
| 17 Sep | 3,47,255 | 2,12,006 | +785 |
| 16 Sep | 3,46,304 | 2,11,221 | +755 |
| 15 Sep | 3,45,317 | 2,10,466 | +82 |
| 14 Sep | 3,45,025 | 2,10,384 | +170 |
| 13 Sep | 3,44,478 | 2,10,214 | +874 |
| 12 Sep | 3,42,887 | 2,09,340 | +1,516 |
| 11 Sep | 3,41,598 | 2,07,824 | +1,541 |
| 10 Sep | 3,40,159 | 2,06,283 | +1,333 |
| 9 Sep | 3,39,001 | 2,04,950 | +1,635 |
| 8 Sep | 3,37,139 | 2,03,315 | +1,694 |
| 7 Sep | 3,35,140 | 2,01,621 | +265 |
| 6 Sep | 3,34,613 | 2,01,356 | +1,745 |
| 5 Sep | 3,32,817 | 1,99,611 | +1,195 |
| 4 Sep | 3,31,894 | 1,98,416 | +1,714 |
| 3 Sep | 3,29,967 | 1,96,702 | +1,704 |
| 2 Sep | 3,27,826 | 1,94,998 | +3,820 |
| 31 Aug | 3,24,753 | 1,91,178 | +445 |
| 30 Aug | 3,24,324 | 1,90,733 | +1,754 |
One reading a morning. No reading was taken on 1 Sep; the change recorded after a gap covers the whole gap.
All 36 states and UTs, by installations
Where Odisha ranks
Bar heights use a log scale, so the smallest states and UTs stay visible. Each step up the scale is ten times more installations.
| # | State / UT | Installations | Built |
|---|---|---|---|
| 5 | Kerala | 3,60,722 | 76% |
| 6 | Rajasthan | 3,32,644 | 67% |
| 7 | Odisha | 2,25,820 | 62% |
| 8 | Assam | 1,90,819 | 46% |
| 9 | Madhya Pradesh | 1,84,661 | 75% |
No. 7 of 36
Odisha by installations recorded, among India's 36 states and UTs. By applications it is No. 8.
30 of 30 districts with applications
District-wise PM Surya Ghar progress in Odisha
Ganjam has the most installations, with 21,990.
InstallationsAdded in the last 7 days
| District | Installations | Applications | Built | Capacity | Avg system | Subsidy | 7 days |
|---|---|---|---|---|---|---|---|
| 1Ganjam | 21,990 | 32,947 | 67% | 41.3 MW | 1.88 kW | ₹84.0 Cr | +1,529 |
| 2Baleshwar | 21,474 | 32,159 | 67% | 44.6 MW | 2.08 kW | ₹77.0 Cr | +1,059 |
| 3Khordha | 17,275 | 25,438 | 68% | 52.5 MW | 3.04 kW | ₹104 Cr | +601 |
| 4Cuttack | 16,768 | 26,423 | 63% | 42.5 MW | 2.53 kW | ₹84.0 Cr | +574 |
| 5Mayurbhanj | 12,377 | 17,133 | 72% | 24.0 MW | 1.94 kW | ₹48.5 Cr | +628 |
| 6Bargarh | 11,154 | 16,575 | 67% | 26.6 MW | 2.38 kW | ₹50.9 Cr | +541 |
| 7Jajapur | 10,952 | 18,674 | 59% | 26.4 MW | 2.41 kW | ₹47.3 Cr | +393 |
| 8Nuapada | 10,811 | 14,067 | 77% | 18.5 MW | 1.71 kW | ₹40.2 Cr | +209 |
| 9Sundargarh | 8,459 | 13,314 | 64% | 22.7 MW | 2.68 kW | ₹43.4 Cr | +271 |
| 10Puri | 8,449 | 14,466 | 58% | 16.2 MW | 1.92 kW | ₹30.0 Cr | +441 |
| 11Balangir | 8,320 | 13,739 | 61% | 18.7 MW | 2.25 kW | ₹34.9 Cr | +443 |
| 12Jagatsinghapur | 8,131 | 14,595 | 56% | 17.6 MW | 2.17 kW | ₹34.1 Cr | +299 |
| 13Bhadrak | 7,528 | 11,447 | 66% | 14.4 MW | 1.92 kW | ₹26.6 Cr | +432 |
| 14Sambalpur | 7,021 | 11,471 | 61% | 20.5 MW | 2.92 kW | ₹37.1 Cr | +165 |
| 15Kalahandi | 7,008 | 10,283 | 68% | 15.8 MW | 2.26 kW | ₹32.6 Cr | +188 |
| 16Dhenkanal | 6,769 | 12,161 | 56% | 17.0 MW | 2.51 kW | ₹31.5 Cr | +265 |
| 17Kendujhar | 6,331 | 10,600 | 60% | 13.8 MW | 2.18 kW | ₹27.4 Cr | +143 |
| 18Kendrapara | 5,886 | 9,597 | 61% | 10.1 MW | 1.71 kW | ₹20.0 Cr | +189 |
| 19Anugul | 4,620 | 8,895 | 52% | 11.6 MW | 2.50 kW | ₹21.5 Cr | +219 |
| 20Nayagarh | 4,320 | 7,961 | 54% | 10.7 MW | 2.47 kW | ₹19.2 Cr | +236 |
| 21Sonepur | 3,726 | 5,803 | 64% | 9.7 MW | 2.61 kW | ₹19.0 Cr | +81 |
| 22Jharsuguda | 3,457 | 5,397 | 64% | 10.0 MW | 2.89 kW | ₹18.2 Cr | +85 |
| 23Gajapati | 2,727 | 6,017 | 45% | 4.1 MW | 1.51 kW | ₹8.44 Cr | +257 |
| 24Rayagada | 2,097 | 4,062 | 52% | 5.5 MW | 2.63 kW | ₹10.2 Cr | +129 |
| 25Nabarangpur | 2,004 | 4,567 | 44% | 3.1 MW | 1.56 kW | ₹6.60 Cr | +88 |
| 26Koraput | 1,577 | 3,521 | 45% | 4.6 MW | 2.92 kW | ₹8.42 Cr | +81 |
| 27Boudh | 1,397 | 2,993 | 47% | 3.5 MW | 2.49 kW | ₹6.29 Cr | +88 |
| 28Malkangiri | 1,282 | 2,559 | 50% | 2.6 MW | 2.01 kW | ₹4.06 Cr | +89 |
| 29Deogarh | 1,032 | 1,825 | 57% | 2.6 MW | 2.53 kW | ₹4.80 Cr | +24 |
| 30Kandhamal | 878 | 7,738 | 11% | 1.8 MW | 2.06 kW | ₹3.01 Cr | +61 |
All 30 districts are in the table: scroll inside it to see them.
4 DISCOMs handle net metering
By electricity distribution company
| DISCOM | Installations | Applications | Capacity |
|---|---|---|---|
| TPCODL, TP Central Odisha Distribution Ltd. | 72,530 | 1,19,830 | 178.6 MW |
| TPWODL, TP Western Odisha Distribution Limited | 60,998 | 92,484 | 145.1 MW |
| TPNODL, TP Northern Odisha Distribution Limited | 58,333 | 89,594 | 122.8 MW |
| TPSODL, TP Southern Odisha Distribution Limited | 34,101 | 64,664 | 66.7 MW |
-
West Bengal
7,853
installations · No. 21
- Built
- 13%
- Avg system
- 3.48 kW
-
Jharkhand
3,998
installations · No. 24
- Built
- 39%
- Avg system
- 4.26 kW
-
Chhattisgarh
1,10,121
installations · No. 12
- Built
- 51%
- Avg system
- 3.55 kW
-
Andhra Pradesh
4,14,419
installations · No. 4
- Built
- 42%
- Avg system
- 2.82 kW
Central subsidy
PM Surya Ghar subsidy in Odisha
Odisha receives the standard central subsidy: ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, up to ₹78,000 for a system of 3 kW or more, paid into the household's bank account. How the subsidy and application work.
About these figures
Read automatically every morning from the PM Surya Ghar: Muft Bijli Yojana national portal (pmsuryaghar.gov.in, Ministry of New and Renewable Energy), with a daily record kept since 29 Aug 2026. Compiled by Solentra Energies, Mohali. Solentra is not affiliated with MNRE. See every state, district and DISCOM on the India rooftop solar tracker.