Read 28 Sep 2026 from the national portalLast updated:
PM Surya Ghar in Madhya Pradesh: rooftop solar progress
Madhya Pradesh has 1,84,661 rooftop solar systems installed under PM Surya Ghar: Muft Bijli Yojana, from 2,45,442 applications, as recorded on the Government of India national portal. That is No. 9 of India's 36 states and UTs.
Key figures
PM Surya Ghar in Madhya Pradesh, cumulative, as recorded on the national portal. The bar is Madhya Pradesh's share of India's total.
- Applications
- 2,45,4422.9% of India
- Installations
- 1,84,6613.7% of India
- Households covered
- 1,90,6503.2% of India
- Installed capacity
- 692.2 MW4.0% of India
- Subsidy released
- ₹1,273 Cr3.9% of India
Madhya Pradesh against India
How Madhya Pradesh compares with India
Madhya PradeshIndiaRank position
"Applications built" is installations as a share of applications, cumulative. Installations count systems; households count homes covered, and the two differ.
Only what is true for Madhya Pradesh
What stands out
- About 8 in 10 applications have become installations, against 6 in 10 nationally.
Running total, one reading a morning
Installations, day by day
Madhya Pradesh recorded 2,946 new installations in the 7 days to 28 Sep, and 11,342 in September so far.
Running totalDaily changeLast 7 days
Every reading since 29 Aug
| Date | Applications | Installations | Change |
|---|---|---|---|
| 28 Sep | 2,45,442 | 1,84,661 | +160 |
| 27 Sep | 2,45,234 | 1,84,501 | +434 |
| 26 Sep | 2,44,777 | 1,84,067 | +383 |
| 25 Sep | 2,44,358 | 1,83,684 | +460 |
| 24 Sep | 2,43,607 | 1,83,224 | +462 |
| 23 Sep | 2,42,923 | 1,82,762 | +520 |
| 22 Sep | 2,42,282 | 1,82,242 | +527 |
| 21 Sep | 2,41,664 | 1,81,715 | +171 |
| 20 Sep | 2,41,449 | 1,81,544 | +490 |
| 19 Sep | 2,40,914 | 1,81,054 | +525 |
| 18 Sep | 2,40,370 | 1,80,529 | +475 |
| 17 Sep | 2,39,796 | 1,80,054 | +527 |
| 16 Sep | 2,39,230 | 1,79,527 | +443 |
| 15 Sep | 2,38,730 | 1,79,084 | +284 |
| 14 Sep | 2,38,339 | 1,78,800 | +126 |
| 13 Sep | 2,38,150 | 1,78,674 | +509 |
| 12 Sep | 2,37,687 | 1,78,165 | +551 |
| 11 Sep | 2,37,190 | 1,77,614 | +492 |
| 10 Sep | 2,36,665 | 1,77,122 | +498 |
| 9 Sep | 2,36,146 | 1,76,624 | +465 |
| 8 Sep | 2,35,598 | 1,76,159 | +451 |
| 7 Sep | 2,35,076 | 1,75,708 | +131 |
| 6 Sep | 2,34,863 | 1,75,577 | +409 |
| 5 Sep | 2,34,424 | 1,75,168 | +410 |
| 4 Sep | 2,34,034 | 1,74,758 | +504 |
| 3 Sep | 2,33,472 | 1,74,254 | +566 |
| 2 Sep | 2,32,871 | 1,73,688 | +1,102 |
| 31 Aug | 2,31,870 | 1,72,586 | +100 |
| 30 Aug | 2,31,703 | 1,72,486 | +320 |
One reading a morning. No reading was taken on 1 Sep; the change recorded after a gap covers the whole gap.
All 36 states and UTs, by installations
Where Madhya Pradesh ranks
Bar heights use a log scale, so the smallest states and UTs stay visible. Each step up the scale is ten times more installations.
| # | State / UT | Installations | Built |
|---|---|---|---|
| 7 | Odisha | 2,25,820 | 62% |
| 8 | Assam | 1,90,819 | 46% |
| 9 | Madhya Pradesh | 1,84,661 | 75% |
| 10 | Haryana | 1,44,621 | 66% |
| 11 | Uttarakhand | 1,10,700 | 73% |
No. 9 of 36
Madhya Pradesh by installations recorded, among India's 36 states and UTs. By applications it is No. 10.
55 of 55 districts with applications
District-wise PM Surya Ghar progress in Madhya Pradesh
Indore has the most installations, with 31,672.
InstallationsAdded in the last 7 days
| District | Installations | Applications | Built | Capacity | Avg system | Subsidy | 7 days |
|---|---|---|---|---|---|---|---|
| 1Indore | 31,672 | 42,925 | 74% | 122.5 MW | 3.87 kW | ₹220 Cr | +474 |
| 2Bhopal | 29,390 | 34,493 | 85% | 114.5 MW | 3.89 kW | ₹210 Cr | +405 |
| 3Jabalpur | 12,347 | 14,932 | 83% | 45.3 MW | 3.67 kW | ₹87.8 Cr | +151 |
| 4Gwalior | 9,921 | 12,295 | 81% | 42.6 MW | 4.30 kW | ₹69.1 Cr | +188 |
| 5Ratlam | 7,580 | 12,185 | 62% | 25.8 MW | 3.40 kW | ₹47.9 Cr | +158 |
| 6Ujjain | 6,833 | 9,626 | 71% | 24.3 MW | 3.56 kW | ₹46.7 Cr | +120 |
| 7Vidisha | 5,813 | 7,134 | 81% | 20.7 MW | 3.57 kW | ₹40.4 Cr | +87 |
| 8Mandsaur | 5,217 | 8,061 | 65% | 18.3 MW | 3.50 kW | ₹34.9 Cr | +95 |
| 9Dewas | 4,409 | 5,775 | 76% | 15.2 MW | 3.44 kW | ₹31.4 Cr | +47 |
| 10Dhar | 4,348 | 6,765 | 64% | 16.0 MW | 3.69 kW | ₹27.8 Cr | +86 |
| 11Sagar | 4,298 | 5,637 | 76% | 15.3 MW | 3.57 kW | ₹30.0 Cr | +54 |
| 12Khargone (West Nimar) | 4,134 | 5,645 | 73% | 14.5 MW | 3.51 kW | ₹28.6 Cr | +74 |
| 13Neemuch | 4,036 | 5,885 | 69% | 14.1 MW | 3.50 kW | ₹26.9 Cr | +63 |
| 14Narmadapuram | 3,994 | 4,752 | 84% | 14.8 MW | 3.72 kW | ₹28.1 Cr | +59 |
| 15Rewa | 3,639 | 4,894 | 74% | 13.2 MW | 3.64 kW | ₹25.2 Cr | +56 |
| 16Sehore | 3,189 | 4,113 | 78% | 11.8 MW | 3.71 kW | ₹21.8 Cr | +53 |
| 17Barwani | 2,754 | 3,653 | 75% | 9.9 MW | 3.58 kW | ₹19.7 Cr | +30 |
| 18Chhatarpur | 2,562 | 3,215 | 80% | 9.6 MW | 3.73 kW | ₹18.3 Cr | +32 |
| 19Satna | 2,532 | 3,386 | 75% | 9.6 MW | 3.79 kW | ₹17.5 Cr | +37 |
| 20Betul | 2,523 | 3,228 | 78% | 9.0 MW | 3.57 kW | ₹17.6 Cr | +44 |
| 21Chhindwara | 2,500 | 3,262 | 77% | 9.2 MW | 3.70 kW | ₹17.1 Cr | +39 |
| 22Guna | 2,445 | 3,269 | 75% | 9.6 MW | 3.94 kW | ₹16.0 Cr | +48 |
| 23Raisen | 2,285 | 3,276 | 70% | 8.4 MW | 3.70 kW | ₹14.8 Cr | +40 |
| 24Damoh | 2,165 | 2,804 | 77% | 7.5 MW | 3.46 kW | ₹15.1 Cr | +18 |
| 25Katni | 2,090 | 2,583 | 81% | 7.6 MW | 3.64 kW | ₹14.3 Cr | +42 |
| 26Balaghat | 1,671 | 2,477 | 67% | 6.2 MW | 3.72 kW | ₹10.8 Cr | +40 |
| 27Harda | 1,637 | 2,154 | 76% | 6.5 MW | 3.97 kW | ₹11.3 Cr | +20 |
| 28Tikamgarh | 1,628 | 2,069 | 79% | 5.8 MW | 3.56 kW | ₹11.3 Cr | +23 |
| 29Ashoknagar | 1,602 | 2,257 | 71% | 6.1 MW | 3.79 kW | ₹10.9 Cr | +25 |
| 30Narsimhapur | 1,505 | 1,855 | 81% | 5.4 MW | 3.58 kW | ₹10.8 Cr | +9 |
| 31Shivpuri | 1,495 | 2,065 | 72% | 6.3 MW | 4.20 kW | ₹9.89 Cr | +28 |
| 32Khandwa (East Nimar) | 1,274 | 2,074 | 61% | 4.7 MW | 3.72 kW | ₹8.40 Cr | +23 |
| 33Shahdol | 1,082 | 1,650 | 66% | 3.8 MW | 3.51 kW | ₹7.06 Cr | +43 |
| 34Rajgarh | 1,044 | 1,518 | 69% | 4.1 MW | 3.94 kW | ₹6.77 Cr | +24 |
| 35Burhanpur | 1,021 | 1,509 | 68% | 3.7 MW | 3.62 kW | ₹6.89 Cr | +27 |
| 36Shajapur | 1,012 | 1,445 | 70% | 3.6 MW | 3.58 kW | ₹6.88 Cr | +18 |
| 37Seoni | 871 | 1,195 | 73% | 3.4 MW | 3.85 kW | ₹5.93 Cr | +21 |
| 38Singrauli | 866 | 1,167 | 74% | 3.2 MW | 3.71 kW | ₹5.99 Cr | +20 |
| 39Panna | 768 | 1,067 | 72% | 2.7 MW | 3.52 kW | ₹5.07 Cr | +11 |
| 40Jhabua | 739 | 1,151 | 64% | 2.7 MW | 3.69 kW | ₹4.71 Cr | +18 |
| 41Datia | 578 | 775 | 75% | 2.4 MW | 4.09 kW | ₹3.69 Cr | +19 |
| 42Alirajpur | 476 | 776 | 61% | 1.8 MW | 3.77 kW | ₹3.10 Cr | +9 |
| 43Agar Malwa | 472 | 789 | 60% | 1.8 MW | 3.74 kW | ₹2.86 Cr | +8 |
| 44Mandla | 457 | 603 | 76% | 1.6 MW | 3.57 kW | ₹2.96 Cr | +10 |
| 45Sheopur | 454 | 612 | 74% | 1.9 MW | 4.22 kW | ₹3.01 Cr | +4 |
| 46Umaria | 295 | 557 | 53% | 1.0 MW | 3.42 kW | ₹1.63 Cr | +22 |
| 47Morena | 261 | 480 | 54% | 1.1 MW | 4.30 kW | ₹1.58 Cr | +3 |
| 48Sidhi | 237 | 396 | 60% | 825 kW | 3.48 kW | ₹1.62 Cr | +5 |
| 49Anuppur | 191 | 336 | 57% | 670 kW | 3.51 kW | ₹1.34 Cr | 0 |
| 50Bhind | 124 | 250 | 50% | 508 kW | 4.10 kW | ₹77.0 L | +3 |
| 51Dindori | 89 | 143 | 62% | 310 kW | 3.48 kW | ₹59.9 L | +2 |
| 52Maihar | 70 | 93 | 75% | 261 kW | 3.73 kW | ₹50.7 L | +1 |
| 53Niwari | 37 | 103 | 36% | 149 kW | 4.03 kW | ₹23.4 L | +5 |
| 54Pandhurna | 27 | 67 | 40% | 87 kW | 3.22 kW | ₹14.4 L | +4 |
| 55Mauganj | 2 | 16 | 13% | 8 kW | 4.00 kW | ₹78,000 | +1 |
All 55 districts are in the table: scroll inside it to see them.
3 DISCOMs handle net metering
By electricity distribution company
| DISCOM | Installations | Applications | Capacity |
|---|---|---|---|
| M.P.Paschim Kshetra Vidyut Vitran Co. | 75,979 | 1,08,266 | 278.9 MW |
| M.P.Madhya Kshetra Vidyut Vitran Co. | 66,753 | 82,668 | 260.5 MW |
| M.P. Poorv Kshetra Vidyut Vitran Co | 41,929 | 54,508 | 152.8 MW |
-
Uttar Pradesh
8,58,106
installations · No. 2
- Built
- 66%
- Avg system
- 3.36 kW
-
Rajasthan
3,32,644
installations · No. 6
- Built
- 67%
- Avg system
- 3.90 kW
-
Gujarat
8,63,729
installations · No. 1
- Built
- 66%
- Avg system
- 3.75 kW
-
Maharashtra
8,19,543
installations · No. 3
- Built
- 53%
- Avg system
- 3.66 kW
-
Chhattisgarh
1,10,121
installations · No. 12
- Built
- 51%
- Avg system
- 3.55 kW
Central subsidy
PM Surya Ghar subsidy in Madhya Pradesh
Madhya Pradesh receives the standard central subsidy: ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, up to ₹78,000 for a system of 3 kW or more, paid into the household's bank account. How the subsidy and application work.
About these figures
Read automatically every morning from the PM Surya Ghar: Muft Bijli Yojana national portal (pmsuryaghar.gov.in, Ministry of New and Renewable Energy), with a daily record kept since 29 Aug 2026. Compiled by Solentra Energies, Mohali. Solentra is not affiliated with MNRE. See every state, district and DISCOM on the India rooftop solar tracker.