Read 28 Sep 2026 from the national portalLast updated:
PM Surya Ghar in Rajasthan: rooftop solar progress
Rajasthan has 3,32,644 rooftop solar systems installed under PM Surya Ghar: Muft Bijli Yojana, from 4,96,804 applications, as recorded on the Government of India national portal. That is No. 6 of India's 36 states and UTs.
Key figures
PM Surya Ghar in Rajasthan, cumulative, as recorded on the national portal. The bar is Rajasthan's share of India's total.
- Applications
- 4,96,8045.8% of India
- Installations
- 3,32,6446.7% of India
- Households covered
- 3,47,2065.9% of India
- Installed capacity
- 1.30 GW7.4% of India
- Subsidy released
- ₹2,185 Cr6.7% of India
Rajasthan against India
How Rajasthan compares with India
RajasthanIndiaRank position
"Applications built" is installations as a share of applications, cumulative. Installations count systems; households count homes covered, and the two differ.
Only what is true for Rajasthan
What stands out
- Rajasthan added the 5th most installations of any state or UT in September so far.
- The average system is 3.90 kW, larger than the national 3.51 kW.
Running total, one reading a morning
Installations, day by day
Rajasthan recorded 6,191 new installations in the 7 days to 28 Sep, and 23,895 in September so far.
Running totalDaily changeLast 7 days
Every reading since 29 Aug
| Date | Applications | Installations | Change |
|---|---|---|---|
| 28 Sep | 4,96,804 | 3,32,644 | +453 |
| 27 Sep | 4,96,184 | 3,32,191 | +873 |
| 26 Sep | 4,95,245 | 3,31,318 | +947 |
| 25 Sep | 4,94,332 | 3,30,371 | +1,008 |
| 24 Sep | 4,93,160 | 3,29,363 | +1,048 |
| 23 Sep | 4,91,947 | 3,28,315 | +1,055 |
| 22 Sep | 4,90,766 | 3,27,260 | +807 |
| 21 Sep | 4,89,649 | 3,26,453 | +428 |
| 20 Sep | 4,89,048 | 3,26,025 | +797 |
| 19 Sep | 4,87,984 | 3,25,228 | +1,063 |
| 18 Sep | 4,86,872 | 3,24,165 | +871 |
| 17 Sep | 4,85,694 | 3,23,294 | +1,124 |
| 16 Sep | 4,84,377 | 3,22,170 | +1,095 |
| 15 Sep | 4,83,120 | 3,21,075 | +883 |
| 14 Sep | 4,82,125 | 3,20,192 | +342 |
| 13 Sep | 4,81,573 | 3,19,850 | +719 |
| 12 Sep | 4,80,580 | 3,19,131 | +847 |
| 11 Sep | 4,79,669 | 3,18,284 | +1,058 |
| 10 Sep | 4,78,430 | 3,17,226 | +959 |
| 9 Sep | 4,77,339 | 3,16,267 | +1,123 |
| 8 Sep | 4,76,070 | 3,15,144 | +1,162 |
| 7 Sep | 4,74,800 | 3,13,982 | +429 |
| 6 Sep | 4,74,189 | 3,13,553 | +874 |
| 5 Sep | 4,73,185 | 3,12,679 | +813 |
| 4 Sep | 4,72,043 | 3,11,866 | +1,235 |
| 3 Sep | 4,70,803 | 3,10,631 | +1,136 |
| 2 Sep | 4,69,334 | 3,09,495 | +2,456 |
| 31 Aug | 4,66,565 | 3,07,039 | +320 |
| 30 Aug | 4,66,036 | 3,06,719 | +681 |
One reading a morning. No reading was taken on 1 Sep; the change recorded after a gap covers the whole gap.
All 36 states and UTs, by installations
Where Rajasthan ranks
Bar heights use a log scale, so the smallest states and UTs stay visible. Each step up the scale is ten times more installations.
| # | State / UT | Installations | Built |
|---|---|---|---|
| 4 | Andhra Pradesh | 4,14,419 | 42% |
| 5 | Kerala | 3,60,722 | 76% |
| 6 | Rajasthan | 3,32,644 | 67% |
| 7 | Odisha | 2,25,820 | 62% |
| 8 | Assam | 1,90,819 | 46% |
No. 6 of 36
Rajasthan by installations recorded, among India's 36 states and UTs. By applications it is No. 5.
50 of 50 districts with applications
District-wise PM Surya Ghar progress in Rajasthan
Jaipur has the most installations, with 70,307.
InstallationsAdded in the last 7 days
| District | Installations | Applications | Built | Capacity | Avg system | Subsidy | 7 days |
|---|---|---|---|---|---|---|---|
| 1Jaipur | 70,307 | 97,182 | 72% | 303.5 MW | 4.32 kW | ₹454 Cr | +1,333 |
| 2Ganganagar | 29,183 | 39,426 | 74% | 100.0 MW | 3.43 kW | ₹203 Cr | +390 |
| 3Sikar | 20,437 | 31,141 | 66% | 78.8 MW | 3.86 kW | ₹137 Cr | +395 |
| 4Jhunjhunu | 19,034 | 28,309 | 67% | 69.2 MW | 3.64 kW | ₹124 Cr | +423 |
| 5Hanumangarh | 17,955 | 25,045 | 72% | 62.4 MW | 3.47 kW | ₹123 Cr | +290 |
| 6Jodhpur | 16,364 | 26,195 | 62% | 68.4 MW | 4.18 kW | ₹108 Cr | +283 |
| 7Kota | 13,282 | 18,240 | 73% | 56.6 MW | 4.26 kW | ₹78.3 Cr | +208 |
| 8Udaipur | 13,238 | 18,189 | 73% | 52.3 MW | 3.95 kW | ₹93.4 Cr | +218 |
| 9Ajmer | 12,976 | 20,675 | 63% | 47.0 MW | 3.62 kW | ₹85.1 Cr | +280 |
| 10Bikaner | 12,102 | 18,697 | 65% | 49.2 MW | 4.06 kW | ₹74.5 Cr | +231 |
| 11Bhilwara | 11,712 | 18,233 | 64% | 42.3 MW | 3.61 kW | ₹76.7 Cr | +233 |
| 12Churu | 9,336 | 14,676 | 64% | 37.3 MW | 3.99 kW | ₹61.1 Cr | +174 |
| 13Chittorgarh | 9,190 | 12,595 | 73% | 33.2 MW | 3.61 kW | ₹63.0 Cr | +140 |
| 14Alwar | 7,651 | 11,036 | 69% | 33.5 MW | 4.37 kW | ₹50.2 Cr | +146 |
| 15Pali | 6,277 | 10,745 | 58% | 23.1 MW | 3.69 kW | ₹40.5 Cr | +131 |
| 16Didwana Kuchaman | 5,741 | 8,798 | 65% | 20.9 MW | 3.64 kW | ₹38.5 Cr | +94 |
| 17Nagaur | 4,168 | 6,399 | 65% | 15.8 MW | 3.80 kW | ₹28.0 Cr | +68 |
| 18Rajsamand | 3,467 | 5,434 | 64% | 12.5 MW | 3.61 kW | ₹22.5 Cr | +81 |
| 19Dausa | 3,419 | 5,362 | 64% | 13.1 MW | 3.84 kW | ₹22.6 Cr | +57 |
| 20Beawar | 3,243 | 5,402 | 60% | 11.4 MW | 3.53 kW | ₹20.9 Cr | +77 |
| 21Bharatpur | 3,232 | 5,588 | 58% | 12.5 MW | 3.88 kW | ₹18.9 Cr | +68 |
| 22Tonk | 3,046 | 5,161 | 59% | 11.4 MW | 3.74 kW | ₹20.0 Cr | +59 |
| 23Barmer | 2,953 | 5,586 | 53% | 12.1 MW | 4.11 kW | ₹17.3 Cr | +57 |
| 24Jhalawar | 2,787 | 3,843 | 73% | 11.0 MW | 3.96 kW | ₹18.7 Cr | +48 |
| 25Kotputli-Behror | 2,716 | 4,077 | 67% | 10.1 MW | 3.73 kW | ₹17.8 Cr | +90 |
| 26Dungarpur | 2,709 | 4,124 | 66% | 10.4 MW | 3.82 kW | ₹18.0 Cr | +60 |
| 27Jalore | 2,691 | 4,535 | 59% | 10.3 MW | 3.82 kW | ₹17.3 Cr | +37 |
| 28Sirohi | 2,510 | 3,172 | 79% | 9.3 MW | 3.72 kW | ₹16.9 Cr | +36 |
| 29Pratapgarh | 2,427 | 3,626 | 67% | 8.1 MW | 3.34 kW | ₹16.3 Cr | +90 |
| 30Banswara | 2,394 | 4,249 | 56% | 8.9 MW | 3.74 kW | ₹15.6 Cr | +31 |
| 31Sawai Madhopur | 2,358 | 7,369 | 32% | 9.6 MW | 4.08 kW | ₹16.6 Cr | +26 |
| 32Baran | 2,100 | 2,836 | 74% | 8.5 MW | 4.07 kW | ₹13.7 Cr | +28 |
| 33Bundi | 1,962 | 2,722 | 72% | 8.3 MW | 4.21 kW | ₹13.5 Cr | +22 |
| 34Balotra | 1,789 | 3,559 | 50% | 7.1 MW | 3.98 kW | ₹10.6 Cr | +55 |
| 35Dholpur | 1,644 | 2,445 | 67% | 5.4 MW | 3.28 kW | ₹10.8 Cr | +29 |
| 36Karauli | 1,338 | 2,033 | 66% | 5.1 MW | 3.80 kW | ₹8.77 Cr | +24 |
| 37Khairthal-Tijara | 1,206 | 1,910 | 63% | 4.7 MW | 3.86 kW | ₹7.46 Cr | +25 |
| 38Jaisalmer | 652 | 1,151 | 57% | 2.5 MW | 3.88 kW | ₹4.13 Cr | +18 |
| 39Phalodi | 445 | 1,052 | 42% | 1.9 MW | 4.29 kW | ₹2.70 Cr | +8 |
| 40Salumbar | 414 | 865 | 48% | 1.6 MW | 3.98 kW | ₹2.64 Cr | +16 |
| 41Anoopgarh | 390 | 679 | 57% | 1.5 MW | 3.91 kW | ₹2.72 Cr | +7 |
| 42Deeg | 365 | 716 | 51% | 1.3 MW | 3.63 kW | ₹2.41 Cr | +5 |
| 43Kekri | 328 | 493 | 67% | 1.2 MW | 3.74 kW | ₹2.32 Cr | +8 |
| 44Jaipur Gramin | 271 | 1,549 | 17% | 1.0 MW | 3.73 kW | ₹60.7 L | +74 |
| 45Neem Ka Thana | 223 | 334 | 67% | 903 kW | 4.05 kW | ₹1.69 Cr | +2 |
| 46Shahpura | 209 | 269 | 78% | 735 kW | 3.52 kW | ₹1.50 Cr | +1 |
| 47Gangapurcity | 176 | 223 | 79% | 666 kW | 3.78 kW | ₹1.22 Cr | +2 |
| 48Sanchor | 165 | 241 | 68% | 657 kW | 3.98 kW | ₹1.15 Cr | 0 |
| 49Jodhpur Gramin | 44 | 521 | 8% | 181 kW | 4.11 kW | ₹16.4 L | +7 |
| 50Dudu | 18 | 97 | 19% | 70 kW | 3.89 kW | ₹7.0 L | +6 |
All 50 districts are in the table: scroll inside it to see them.
7 DISCOMs handle net metering
By electricity distribution company
| DISCOM | Installations | Applications | Capacity |
|---|---|---|---|
| Ajmer Vidyut Vitran Nigam Ltd. | 1,07,368 | 1,62,508 | 398.4 MW |
| Jaipur Vidyut Vitran Nigam Ltd. | 1,04,312 | 1,53,939 | 438.8 MW |
| Jodhpur Vidyut Vitran Nigam Ltd. | 92,978 | 1,40,694 | 345.4 MW |
| Kota Elecricity Distribution Limited | 11,174 | 14,804 | 48.3 MW |
| Bikaner Electricity Supply Limited | 9,881 | 14,588 | 40.6 MW |
| TP Ajmer Distribution Ltd. | 4,540 | 6,624 | 17.0 MW |
| Bharatpur Elecricity Services Limited | 2,391 | 3,647 | 9.4 MW |
-
Punjab
20,028
installations · No. 18
- Built
- 70%
- Avg system
- 4.55 kW
-
Haryana
1,44,621
installations · No. 10
- Built
- 66%
- Avg system
- 3.39 kW
-
Uttar Pradesh
8,58,106
installations · No. 2
- Built
- 66%
- Avg system
- 3.36 kW
-
Madhya Pradesh
1,84,661
installations · No. 9
- Built
- 75%
- Avg system
- 3.75 kW
-
Gujarat
8,63,729
installations · No. 1
- Built
- 66%
- Avg system
- 3.75 kW
Central subsidy
PM Surya Ghar subsidy in Rajasthan
Rajasthan receives the standard central subsidy: ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, up to ₹78,000 for a system of 3 kW or more, paid into the household's bank account. How the subsidy and application work.
About these figures
Read automatically every morning from the PM Surya Ghar: Muft Bijli Yojana national portal (pmsuryaghar.gov.in, Ministry of New and Renewable Energy), with a daily record kept since 29 Aug 2026. Compiled by Solentra Energies, Mohali. Solentra is not affiliated with MNRE. See every state, district and DISCOM on the India rooftop solar tracker.