Maharashtra has 8,19,543 rooftop solar systems installed under PM Surya Ghar: Muft Bijli Yojana, from 15,36,109 applications, as recorded on the Government of India national portal. That is No. 3 of India's 36 states and UTs.
Key figures
PM Surya Ghar in Maharashtra, cumulative, as recorded on the national portal. The bar is Maharashtra's share of India's total.
- Applications
- 15,36,10918% of India
- Installations
- 8,19,54316% of India
- Households covered
- 12,65,05921% of India
- Installed capacity
- 3.00 GW17% of India
- Subsidy released
- ₹5,803 Cr18% of India
Maharashtra against India
How Maharashtra compares with India
MaharashtraIndiaRank position
"Applications built" is installations as a share of applications, cumulative. Installations count systems; households count homes covered, and the two differ.
Only what is true for Maharashtra
What stands out
- Maharashtra added the 2nd most installations of any state or UT in September so far.
Running total, one reading a morning
Installations, day by day
Maharashtra recorded 12,552 new installations in the 7 days to 28 Sep, and 52,250 in September so far.
Running totalDaily changeLast 7 days
Every reading since 29 Aug
| Date | Applications | Installations | Change |
|---|---|---|---|
| 28 Sep | 15,36,109 | 8,19,543 | +630 |
| 27 Sep | 15,34,776 | 8,18,913 | +1,368 |
| 26 Sep | 15,32,175 | 8,17,545 | +1,249 |
| 25 Sep | 15,30,102 | 8,16,296 | +2,308 |
| 24 Sep | 15,27,285 | 8,13,988 | +2,135 |
| 23 Sep | 15,24,291 | 8,11,853 | +2,343 |
| 22 Sep | 15,21,165 | 8,09,510 | +2,519 |
| 21 Sep | 15,18,151 | 8,06,991 | +631 |
| 20 Sep | 15,16,728 | 8,06,360 | +1,192 |
| 19 Sep | 15,14,639 | 8,05,168 | +1,610 |
| 18 Sep | 15,12,536 | 8,03,558 | +2,188 |
| 17 Sep | 15,10,158 | 8,01,370 | +2,486 |
| 16 Sep | 15,07,692 | 7,98,884 | +2,517 |
| 15 Sep | 15,33,022 | 7,96,367 | +710 |
| 14 Sep | 15,31,900 | 7,95,657 | +570 |
| 13 Sep | 15,30,876 | 7,95,087 | +1,539 |
| 12 Sep | 15,28,742 | 7,93,548 | +2,129 |
| 11 Sep | 15,26,687 | 7,91,419 | +2,342 |
| 10 Sep | 15,24,446 | 7,89,077 | +2,813 |
| 9 Sep | 15,21,647 | 7,86,264 | +2,827 |
| 8 Sep | 15,18,986 | 7,83,437 | +2,864 |
| 7 Sep | 15,16,260 | 7,80,573 | +696 |
| 6 Sep | 15,14,999 | 7,79,877 | +1,640 |
| 5 Sep | 15,12,821 | 7,78,237 | +2,725 |
| 4 Sep | 15,10,170 | 7,75,512 | +2,752 |
| 3 Sep | 15,07,183 | 7,72,760 | +3,207 |
| 2 Sep | 15,04,195 | 7,69,553 | +6,396 |
| 31 Aug | 14,98,528 | 7,63,157 | +808 |
| 30 Aug | 14,97,338 | 7,62,349 | +1,680 |
One reading a morning. No reading was taken on 1 Sep; the change recorded after a gap covers the whole gap.
All 36 states and UTs, by installations
Where Maharashtra ranks
Bar heights use a log scale, so the smallest states and UTs stay visible. Each step up the scale is ten times more installations.
| # | State / UT | Installations | Built |
|---|---|---|---|
| 1 | Gujarat | 8,63,729 | 66% |
| 2 | Uttar Pradesh | 8,58,106 | 66% |
| 3 | Maharashtra | 8,19,543 | 53% |
| 4 | Andhra Pradesh | 4,14,419 | 42% |
| 5 | Kerala | 3,60,722 | 76% |
No. 3 of 36
Maharashtra by installations recorded, among India's 36 states and UTs. By applications it is No. 1.
36 of 36 districts with applications
District-wise PM Surya Ghar progress in Maharashtra
Nagpur has the most installations, with 1,16,964.
InstallationsAdded in the last 7 days
| District | Installations | Applications | Built | Capacity | Avg system | Subsidy | 7 days |
|---|---|---|---|---|---|---|---|
| 1Nagpur | 1,16,964 | 1,64,997 | 71% | 425.2 MW | 3.64 kW | ₹828 Cr | +1,647 |
| 2Pune | 60,146 | 1,03,389 | 58% | 264.4 MW | 4.40 kW | ₹475 Cr | +1,126 |
| 3Jalgaon | 56,753 | 97,942 | 58% | 200.3 MW | 3.53 kW | ₹397 Cr | +762 |
| 4Chhatrapati Sambhajinagar | 53,199 | 73,880 | 72% | 183.8 MW | 3.45 kW | ₹371 Cr | +796 |
| 5Nashik | 52,342 | 1,26,269 | 41% | 184.1 MW | 3.52 kW | ₹362 Cr | +842 |
| 6Amravati | 45,826 | 60,009 | 76% | 162.1 MW | 3.54 kW | ₹319 Cr | +588 |
| 7Kolhapur | 35,223 | 72,878 | 48% | 119.9 MW | 3.40 kW | ₹240 Cr | +545 |
| 8Ahilyanagar | 32,622 | 74,908 | 44% | 109.4 MW | 3.35 kW | ₹225 Cr | +596 |
| 9Solapur | 30,312 | 64,162 | 47% | 106.2 MW | 3.50 kW | ₹210 Cr | +421 |
| 10Buldhana | 25,981 | 45,077 | 58% | 90.4 MW | 3.48 kW | ₹183 Cr | +368 |
| 11Wardha | 23,864 | 41,357 | 58% | 82.1 MW | 3.44 kW | ₹169 Cr | +312 |
| 12Chandrapur | 23,562 | 36,609 | 64% | 85.6 MW | 3.63 kW | ₹159 Cr | +392 |
| 13Sangli | 22,473 | 47,663 | 47% | 74.6 MW | 3.32 kW | ₹149 Cr | +459 |
| 14Dhule | 22,275 | 48,447 | 46% | 78.6 MW | 3.53 kW | ₹157 Cr | +334 |
| 15Akola | 22,103 | 33,702 | 66% | 79.6 MW | 3.60 kW | ₹150 Cr | +313 |
| 16Yavatmal | 21,540 | 35,276 | 61% | 77.6 MW | 3.60 kW | ₹147 Cr | +359 |
| 17Latur | 19,559 | 50,779 | 39% | 68.6 MW | 3.51 kW | ₹134 Cr | +290 |
| 18Satara | 17,835 | 68,686 | 26% | 57.2 MW | 3.21 kW | ₹112 Cr | +330 |
| 19Bhandara | 16,857 | 31,118 | 54% | 58.0 MW | 3.44 kW | ₹117 Cr | +275 |
| 20Nanded | 13,817 | 22,911 | 60% | 55.8 MW | 4.04 kW | ₹96.7 Cr | +210 |
| 21Jalna | 12,558 | 19,232 | 65% | 43.8 MW | 3.49 kW | ₹87.5 Cr | +139 |
| 22Gondia | 12,251 | 24,078 | 51% | 43.8 MW | 3.57 kW | ₹80.2 Cr | +266 |
| 23Raigad | 11,096 | 29,720 | 37% | 44.5 MW | 4.01 kW | ₹82.5 Cr | +182 |
| 24Beed | 10,846 | 21,523 | 50% | 41.0 MW | 3.78 kW | ₹75.9 Cr | +184 |
| 25Nandurbar | 10,384 | 26,209 | 40% | 37.3 MW | 3.59 kW | ₹73.6 Cr | +102 |
| 26Washim | 9,986 | 17,455 | 57% | 34.9 MW | 3.50 kW | ₹68.6 Cr | +156 |
| 27Parbhani | 9,731 | 14,165 | 69% | 34.8 MW | 3.57 kW | ₹69.1 Cr | +85 |
| 28Dharashiv | 5,676 | 15,967 | 36% | 20.4 MW | 3.59 kW | ₹38.8 Cr | +113 |
| 29Gadchiroli | 5,241 | 12,223 | 43% | 18.7 MW | 3.57 kW | ₹33.7 Cr | +128 |
| 30Thane | 4,330 | 9,768 | 44% | 41.9 MW | 9.68 kW | ₹68.3 Cr | +61 |
| 31Hingoli | 4,068 | 7,924 | 51% | 14.8 MW | 3.64 kW | ₹28.9 Cr | +43 |
| 32Palghar | 3,771 | 18,368 | 21% | 16.2 MW | 4.30 kW | ₹27.7 Cr | +41 |
| 33Ratnagiri | 2,879 | 11,965 | 24% | 10.4 MW | 3.61 kW | ₹19.8 Cr | +50 |
| 34Sindhudurg | 2,640 | 5,936 | 44% | 9.2 MW | 3.47 kW | ₹17.2 Cr | +35 |
| 35Mumbai Suburban | 666 | 1,288 | 52% | 17.2 MW | 25.87 kW | ₹24.5 Cr | +2 |
| 36Mumbai | 167 | 229 | 73% | 3.7 MW | 22.45 kW | ₹5.72 Cr | 0 |
All 36 districts are in the table: scroll inside it to see them.
5 DISCOMs handle net metering
By electricity distribution company
| DISCOM | Installations | Applications | Capacity |
|---|---|---|---|
| Maharashtra State Electricity Distribution Co. Ltd | 8,18,834 | 15,34,982 | 2.98 GW |
| Adani Electricity Mumbai Limited | 468 | 727 | 11.6 MW |
| Tata Power Co. Ltd | 183 | 310 | 5.5 MW |
| Brihanmumbai Electric Supply & Transport (BEST) | 54 | 86 | 1.4 MW |
| NIDAR UTILITIES PANVEL LLP | 4 | 4 | 304 kW |
-
Gujarat
8,63,729
installations · No. 1
- Built
- 66%
- Avg system
- 3.75 kW
-
Madhya Pradesh
1,84,661
installations · No. 9
- Built
- 75%
- Avg system
- 3.75 kW
-
Chhattisgarh
1,10,121
installations · No. 12
- Built
- 51%
- Avg system
- 3.55 kW
-
Telangana
65,916
installations · No. 14
- Built
- 69%
- Avg system
- 3.67 kW
-
Karnataka
26,022
installations · No. 17
- Built
- 44%
- Avg system
- 4.15 kW
-
Goa
3,852
installations · No. 25
- Built
- 78%
- Avg system
- 8.23 kW
Central subsidy
PM Surya Ghar subsidy in Maharashtra
Maharashtra receives the standard central subsidy: ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, up to ₹78,000 for a system of 3 kW or more, paid into the household's bank account. How the subsidy and application work.
About these figures
Read automatically every morning from the PM Surya Ghar: Muft Bijli Yojana national portal (pmsuryaghar.gov.in, Ministry of New and Renewable Energy), with a daily record kept since 29 Aug 2026. Compiled by Solentra Energies, Mohali. Solentra is not affiliated with MNRE. See every state, district and DISCOM on the India rooftop solar tracker.