Read 28 Sep 2026 from the national portalLast updated:
PM Surya Ghar in Tamil Nadu: rooftop solar progress
Tamil Nadu has 1,00,057 rooftop solar systems installed under PM Surya Ghar: Muft Bijli Yojana, from 1,19,370 applications, as recorded on the Government of India national portal. That is No. 13 of India's 36 states and UTs.
Key figures
PM Surya Ghar in Tamil Nadu, cumulative, as recorded on the national portal. The bar is Tamil Nadu's share of India's total.
- Applications
- 1,19,3701.4% of India
- Installations
- 1,00,0572.0% of India
- Households covered
- 1,16,5202.0% of India
- Installed capacity
- 366.4 MW2.1% of India
- Subsidy released
- ₹670 Cr2.0% of India
Tamil Nadu against India
How Tamil Nadu compares with India
Tamil NaduIndiaRank position
"Applications built" is installations as a share of applications, cumulative. Installations count systems; households count homes covered, and the two differ.
Only what is true for Tamil Nadu
What stands out
- About 8 in 10 applications have become installations, against 6 in 10 nationally.
Running total, one reading a morning
Installations, day by day
Tamil Nadu recorded 1,778 new installations in the 7 days to 28 Sep, and 5,979 in September so far.
Running totalDaily changeLast 7 days
Every reading since 29 Aug
| Date | Applications | Installations | Change |
|---|---|---|---|
| 28 Sep | 1,19,370 | 1,00,057 | +77 |
| 27 Sep | 1,19,193 | 99,980 | +262 |
| 26 Sep | 1,18,551 | 99,718 | +314 |
| 25 Sep | 1,17,666 | 99,404 | +270 |
| 24 Sep | 1,16,727 | 99,134 | +264 |
| 23 Sep | 1,15,936 | 98,870 | +314 |
| 22 Sep | 1,15,130 | 98,556 | +277 |
| 21 Sep | 1,14,340 | 98,279 | +50 |
| 20 Sep | 1,14,192 | 98,229 | +208 |
| 19 Sep | 1,13,990 | 98,021 | +290 |
| 18 Sep | 1,13,714 | 97,731 | +262 |
| 17 Sep | 1,13,480 | 97,469 | +288 |
| 16 Sep | 1,13,123 | 97,181 | +286 |
| 15 Sep | 1,12,787 | 96,895 | +90 |
| 14 Sep | 1,12,597 | 96,805 | +24 |
| 13 Sep | 1,12,528 | 96,781 | +196 |
| 12 Sep | 1,12,282 | 96,585 | +284 |
| 11 Sep | 1,11,966 | 96,301 | +268 |
| 10 Sep | 1,11,645 | 96,033 | +320 |
| 9 Sep | 1,11,380 | 95,713 | +251 |
| 8 Sep | 1,11,094 | 95,462 | +241 |
| 7 Sep | 1,10,790 | 95,221 | +27 |
| 6 Sep | 1,10,726 | 95,194 | +191 |
| 5 Sep | 1,10,516 | 95,003 | +241 |
| 4 Sep | 1,10,248 | 94,762 | +293 |
| 3 Sep | 1,09,918 | 94,469 | +247 |
| 2 Sep | 1,09,628 | 94,222 | +518 |
| 31 Aug | 1,09,052 | 93,704 | +17 |
| 30 Aug | 1,09,013 | 93,687 | +201 |
One reading a morning. No reading was taken on 1 Sep; the change recorded after a gap covers the whole gap.
All 36 states and UTs, by installations
Where Tamil Nadu ranks
Bar heights use a log scale, so the smallest states and UTs stay visible. Each step up the scale is ten times more installations.
| # | State / UT | Installations | Built |
|---|---|---|---|
| 11 | Uttarakhand | 1,10,700 | 73% |
| 12 | Chhattisgarh | 1,10,121 | 51% |
| 13 | Tamil Nadu | 1,00,057 | 84% |
| 14 | Telangana | 65,916 | 69% |
| 15 | Jammu and Kashmir | 45,422 | 51% |
No. 13 of 36
Tamil Nadu by installations recorded, among India's 36 states and UTs. By applications it is No. 14.
38 of 38 districts with applications
District-wise PM Surya Ghar progress in Tamil Nadu
Coimbatore has the most installations, with 12,282.
InstallationsAdded in the last 7 days
| District | Installations | Applications | Built | Capacity | Avg system | Subsidy | 7 days |
|---|---|---|---|---|---|---|---|
| 1Coimbatore | 12,282 | 13,983 | 88% | 45.0 MW | 3.66 kW | ₹84.8 Cr | +176 |
| 2Chennai | 11,812 | 14,146 | 84% | 46.3 MW | 3.92 kW | ₹75.6 Cr | +327 |
| 3Chengalpattu | 7,530 | 8,570 | 88% | 28.9 MW | 3.83 kW | ₹52.1 Cr | +86 |
| 4Erode | 4,738 | 5,529 | 86% | 17.1 MW | 3.61 kW | ₹32.0 Cr | +98 |
| 5Salem | 4,606 | 5,477 | 84% | 16.8 MW | 3.65 kW | ₹31.2 Cr | +71 |
| 6Tiruchirappalli | 4,596 | 5,540 | 83% | 16.8 MW | 3.66 kW | ₹30.9 Cr | +77 |
| 7Tiruppur | 4,485 | 5,216 | 86% | 16.9 MW | 3.76 kW | ₹30.2 Cr | +74 |
| 8Namakkal | 4,450 | 5,082 | 88% | 15.8 MW | 3.55 kW | ₹31.0 Cr | +72 |
| 9Thiruvallur | 4,341 | 5,262 | 82% | 15.9 MW | 3.66 kW | ₹28.8 Cr | +46 |
| 10Madurai | 4,084 | 5,004 | 82% | 15.2 MW | 3.71 kW | ₹26.5 Cr | +83 |
| 11Kanchipuram | 3,569 | 4,220 | 85% | 13.1 MW | 3.66 kW | ₹23.9 Cr | +72 |
| 12Thanjavur | 3,189 | 3,846 | 83% | 11.6 MW | 3.64 kW | ₹21.2 Cr | +40 |
| 13Virudhunagar | 2,574 | 2,903 | 89% | 9.2 MW | 3.57 kW | ₹17.2 Cr | +55 |
| 14Karur | 2,570 | 2,875 | 89% | 8.9 MW | 3.46 kW | ₹17.6 Cr | +39 |
| 15Tirunelveli | 2,308 | 2,794 | 83% | 8.5 MW | 3.68 kW | ₹15.0 Cr | +61 |
| 16Cuddalore | 2,301 | 2,920 | 79% | 8.0 MW | 3.46 kW | ₹15.4 Cr | +41 |
| 17Thoothukkudi | 2,212 | 2,581 | 86% | 8.0 MW | 3.60 kW | ₹14.9 Cr | +33 |
| 18Kanniyakumari | 2,171 | 2,602 | 83% | 8.0 MW | 3.66 kW | ₹14.9 Cr | +34 |
| 19Vellore | 1,738 | 2,196 | 79% | 6.2 MW | 3.57 kW | ₹11.7 Cr | +30 |
| 20Dindigul | 1,436 | 1,820 | 79% | 5.2 MW | 3.62 kW | ₹9.85 Cr | +33 |
| 21Tiruvannamalai | 1,236 | 1,628 | 76% | 4.2 MW | 3.40 kW | ₹8.11 Cr | +22 |
| 22Viluppuram | 1,160 | 1,598 | 73% | 4.0 MW | 3.41 kW | ₹7.39 Cr | +25 |
| 23Thiruvarur | 1,138 | 1,458 | 78% | 4.0 MW | 3.52 kW | ₹7.52 Cr | +24 |
| 24Krishnagiri | 1,042 | 1,302 | 80% | 3.7 MW | 3.56 kW | ₹7.11 Cr | +17 |
| 25Sivaganga | 937 | 1,193 | 79% | 3.4 MW | 3.61 kW | ₹6.06 Cr | +12 |
| 26Ranipet | 876 | 1,092 | 80% | 3.1 MW | 3.51 kW | ₹5.81 Cr | +18 |
| 27Tenkasi | 849 | 1,084 | 78% | 2.8 MW | 3.26 kW | ₹5.69 Cr | +11 |
| 28Dharmapuri | 761 | 973 | 78% | 2.5 MW | 3.32 kW | ₹5.17 Cr | +7 |
| 29Pudukkottai | 733 | 921 | 80% | 2.6 MW | 3.53 kW | ₹4.64 Cr | +17 |
| 30Theni | 696 | 829 | 84% | 2.3 MW | 3.33 kW | ₹4.58 Cr | +16 |
| 31Kallakurichi | 690 | 904 | 76% | 2.3 MW | 3.33 kW | ₹4.71 Cr | +7 |
| 32Ramanathapuram | 680 | 881 | 77% | 2.5 MW | 3.72 kW | ₹4.42 Cr | +12 |
| 33Mayiladuthurai | 568 | 708 | 80% | 2.0 MW | 3.49 kW | ₹3.65 Cr | +7 |
| 34Tirupathur | 524 | 686 | 76% | 1.8 MW | 3.39 kW | ₹3.39 Cr | +6 |
| 35Nagapattinam | 420 | 572 | 73% | 1.5 MW | 3.53 kW | ₹2.55 Cr | +14 |
| 36Perambalur | 363 | 466 | 78% | 1.3 MW | 3.54 kW | ₹2.38 Cr | +7 |
| 37Ariyalur | 253 | 328 | 77% | 913 kW | 3.61 kW | ₹1.66 Cr | +7 |
| 38The Nilgiris | 139 | 181 | 77% | 515 kW | 3.71 kW | ₹93.4 L | +1 |
All 38 districts are in the table: scroll inside it to see them.
Net metering in Tamil Nadu is handled by Tamil Nadu Generation and Distribution Company Limited.
-
Kerala
3,60,722
installations · No. 5
- Built
- 76%
- Avg system
- 3.87 kW
-
Karnataka
26,022
installations · No. 17
- Built
- 44%
- Avg system
- 4.15 kW
-
Andhra Pradesh
4,14,419
installations · No. 4
- Built
- 42%
- Avg system
- 2.82 kW
-
Puducherry
6,028
installations · No. 22
- Built
- 79%
- Avg system
- 3.60 kW
Central subsidy
PM Surya Ghar subsidy in Tamil Nadu
Tamil Nadu receives the standard central subsidy: ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, up to ₹78,000 for a system of 3 kW or more, paid into the household's bank account. How the subsidy and application work.
About these figures
Read automatically every morning from the PM Surya Ghar: Muft Bijli Yojana national portal (pmsuryaghar.gov.in, Ministry of New and Renewable Energy), with a daily record kept since 29 Aug 2026. Compiled by Solentra Energies, Mohali. Solentra is not affiliated with MNRE. See every state, district and DISCOM on the India rooftop solar tracker.