PM Surya Ghar in Telangana: rooftop solar progress
Telangana has 65,916 rooftop solar systems installed under PM Surya Ghar: Muft Bijli Yojana, from 95,179 applications, as recorded on the Government of India national portal. That is No. 14 of India's 36 states and UTs.
Key figures
PM Surya Ghar in Telangana, cumulative, as recorded on the national portal. The bar is Telangana's share of India's total.
- Applications
- 95,1791.1% of India
- Installations
- 65,9161.3% of India
- Households covered
- 83,0621.4% of India
- Installed capacity
- 242.0 MW1.4% of India
- Subsidy released
- ₹414 Cr1.3% of India
Telangana against India
How Telangana compares with India
TelanganaIndiaRank position
"Applications built" is installations as a share of applications, cumulative. Installations count systems; households count homes covered, and the two differ.
Only what is true for Telangana
What stands out
- About 7 in 10 applications have become installations, against 6 in 10 nationally.
Running total, one reading a morning
Installations, day by day
Telangana recorded 1,159 new installations in the 7 days to 28 Sep, and 3,574 in September so far.
Running totalDaily changeLast 7 days
Every reading since 29 Aug
| Date | Applications | Installations | Change |
|---|---|---|---|
| 28 Sep | 95,179 | 65,916 | +45 |
| 27 Sep | 95,051 | 65,871 | +172 |
| 26 Sep | 94,859 | 65,699 | +129 |
| 25 Sep | 94,651 | 65,570 | +202 |
| 24 Sep | 94,426 | 65,368 | +139 |
| 23 Sep | 94,028 | 65,229 | +245 |
| 22 Sep | 93,703 | 64,984 | +227 |
| 21 Sep | 93,385 | 64,757 | +27 |
| 20 Sep | 93,275 | 64,730 | +231 |
| 19 Sep | 92,967 | 64,499 | +250 |
| 18 Sep | 92,714 | 64,249 | +273 |
| 17 Sep | 92,448 | 63,976 | +269 |
| 16 Sep | 92,154 | 63,707 | +213 |
| 15 Sep | 91,824 | 63,494 | +21 |
| 14 Sep | 91,785 | 63,473 | +33 |
| 13 Sep | 91,725 | 63,440 | +139 |
| 12 Sep | 91,496 | 63,301 | +216 |
| 11 Sep | 91,208 | 63,085 | +219 |
| 10 Sep | 90,808 | 62,866 | +188 |
| 9 Sep | 90,326 | 62,678 | +171 |
| 8 Sep | 89,784 | 62,507 | +205 |
| 7 Sep | 89,339 | 62,302 | +24 |
| 6 Sep | 89,291 | 62,278 | +154 |
| 5 Sep | 89,028 | 62,124 | +145 |
| 4 Sep | 88,829 | 61,979 | +203 |
| 3 Sep | 88,573 | 61,776 | +236 |
| 2 Sep | 88,295 | 61,540 | +429 |
| 31 Aug | 87,502 | 61,111 | +20 |
| 30 Aug | 87,431 | 61,091 | +194 |
One reading a morning. No reading was taken on 1 Sep; the change recorded after a gap covers the whole gap.
All 36 states and UTs, by installations
Where Telangana ranks
Bar heights use a log scale, so the smallest states and UTs stay visible. Each step up the scale is ten times more installations.
| # | State / UT | Installations | Built |
|---|---|---|---|
| 12 | Chhattisgarh | 1,10,121 | 51% |
| 13 | Tamil Nadu | 1,00,057 | 84% |
| 14 | Telangana | 65,916 | 69% |
| 15 | Jammu and Kashmir | 45,422 | 51% |
| 16 | Bihar | 31,689 | 12% |
No. 14 of 36
Telangana by installations recorded, among India's 36 states and UTs. By applications it is No. 15.
33 of 33 districts with applications
District-wise PM Surya Ghar progress in Telangana
Ranga Reddy has the most installations, with 9,692.
InstallationsAdded in the last 7 days
| District | Installations | Applications | Built | Capacity | Avg system | Subsidy | 7 days |
|---|---|---|---|---|---|---|---|
| 1Ranga Reddy | 9,692 | 13,114 | 74% | 40.2 MW | 4.15 kW | ₹61.3 Cr | +225 |
| 2Medchal Malkajgiri | 8,766 | 11,284 | 78% | 36.9 MW | 4.21 kW | ₹57.8 Cr | +112 |
| 3Khammam | 8,445 | 13,103 | 64% | 24.1 MW | 2.86 kW | ₹46.4 Cr | +166 |
| 4Hyderabad | 4,316 | 5,676 | 76% | 18.9 MW | 4.38 kW | ₹28.3 Cr | +95 |
| 5Hanumakonda | 3,687 | 5,122 | 72% | 12.6 MW | 3.42 kW | ₹25.1 Cr | +51 |
| 6Karimnagar | 3,366 | 4,575 | 74% | 12.3 MW | 3.65 kW | ₹22.0 Cr | +47 |
| 7Bhadradri Kothagudem | 2,851 | 4,539 | 63% | 10.4 MW | 3.63 kW | ₹19.0 Cr | +39 |
| 8Nizamabad | 2,510 | 3,675 | 68% | 9.7 MW | 3.86 kW | ₹15.5 Cr | +43 |
| 9Nalgonda | 2,186 | 3,083 | 71% | 7.4 MW | 3.37 kW | ₹13.0 Cr | +66 |
| 10Mancherial | 2,137 | 3,135 | 68% | 7.5 MW | 3.52 kW | ₹13.6 Cr | +26 |
| 11Suryapet | 1,978 | 2,737 | 72% | 6.9 MW | 3.50 kW | ₹13.3 Cr | +21 |
| 12Sangareddy | 1,934 | 2,608 | 74% | 8.0 MW | 4.13 kW | ₹12.5 Cr | +25 |
| 13Vikarabad | 1,903 | 2,879 | 66% | 4.2 MW | 2.19 kW | ₹10.5 Cr | +9 |
| 14Warangal | 1,624 | 2,506 | 65% | 5.9 MW | 3.61 kW | ₹10.6 Cr | +43 |
| 15Adilabad | 1,569 | 2,030 | 77% | 5.8 MW | 3.71 kW | ₹10.7 Cr | +19 |
| 16Peddapalli | 1,325 | 2,034 | 65% | 4.5 MW | 3.41 kW | ₹8.19 Cr | +23 |
| 17Nagarkurnool | 957 | 1,268 | 75% | 3.0 MW | 3.10 kW | ₹6.08 Cr | +8 |
| 18Siddipet | 839 | 1,288 | 65% | 2.9 MW | 3.51 kW | ₹5.34 Cr | +17 |
| 19Mahbubnagar | 770 | 1,296 | 59% | 2.6 MW | 3.42 kW | ₹4.47 Cr | +28 |
| 20Jagitial | 695 | 1,167 | 60% | 2.6 MW | 3.68 kW | ₹4.31 Cr | +16 |
| 21Mahabubabad | 541 | 1,082 | 50% | 2.0 MW | 3.61 kW | ₹3.10 Cr | +15 |
| 22Jangoan | 518 | 1,326 | 39% | 1.7 MW | 3.36 kW | ₹3.06 Cr | +8 |
| 23Yadadri Bhuvanagiri | 508 | 927 | 55% | 1.8 MW | 3.55 kW | ₹2.97 Cr | +6 |
| 24Nirmal | 477 | 736 | 65% | 1.8 MW | 3.80 kW | ₹3.09 Cr | +7 |
| 25Kamareddy | 433 | 693 | 62% | 1.6 MW | 3.63 kW | ₹2.48 Cr | +12 |
| 26Mulugu | 351 | 594 | 59% | 1.1 MW | 3.16 kW | ₹1.97 Cr | +7 |
| 27Jayashankar Bhupalapally | 315 | 506 | 62% | 970 kW | 3.08 kW | ₹1.87 Cr | +3 |
| 28Wanaparthy | 275 | 433 | 64% | 1.0 MW | 3.70 kW | ₹1.79 Cr | +3 |
| 29Rajanna Sircilla | 269 | 500 | 54% | 1.0 MW | 3.84 kW | ₹1.57 Cr | +4 |
| 30Kumuram Bheem Asifabad | 260 | 553 | 47% | 969 kW | 3.73 kW | ₹1.26 Cr | +4 |
| 31Medak | 201 | 335 | 60% | 767 kW | 3.82 kW | ₹1.21 Cr | +7 |
| 32Jogulamba Gadwal | 162 | 238 | 68% | 656 kW | 4.05 kW | ₹1.03 Cr | +4 |
| 33Narayanpet | 56 | 137 | 41% | 195 kW | 3.48 kW | ₹36.7 L | 0 |
All 33 districts are in the table: scroll inside it to see them.
2 DISCOMs handle net metering
By electricity distribution company
| DISCOM | Installations | Applications | Capacity |
|---|---|---|---|
| Southern Power Distribution Company of Telangana Limited | 34,550 | 47,311 | 135.5 MW |
| Northern Power Distribution Company of Telangana Limited | 31,366 | 47,868 | 106.5 MW |
-
Andhra Pradesh
4,14,419
installations · No. 4
- Built
- 42%
- Avg system
- 2.82 kW
-
Maharashtra
8,19,543
installations · No. 3
- Built
- 53%
- Avg system
- 3.66 kW
-
Karnataka
26,022
installations · No. 17
- Built
- 44%
- Avg system
- 4.15 kW
-
Chhattisgarh
1,10,121
installations · No. 12
- Built
- 51%
- Avg system
- 3.55 kW
Central subsidy
PM Surya Ghar subsidy in Telangana
Telangana receives the standard central subsidy: ₹30,000 per kW for the first 2 kW and ₹18,000 for the third, up to ₹78,000 for a system of 3 kW or more, paid into the household's bank account. How the subsidy and application work.
About these figures
Read automatically every morning from the PM Surya Ghar: Muft Bijli Yojana national portal (pmsuryaghar.gov.in, Ministry of New and Renewable Energy), with a daily record kept since 29 Aug 2026. Compiled by Solentra Energies, Mohali. Solentra is not affiliated with MNRE. See every state, district and DISCOM on the India rooftop solar tracker.